Features Trades AI Software Guide AI Agents Done for you Pricing Blog About FAQ Sign in Get access
TS-101

Tile software that runs the job from layout sign-off to grout.

Showers, tub surrounds, floors, backsplashes and stone, with the layout sign-off and the flood test on the job. Built for small tile shops and one-crew setters.

ProposalSample
Shower remodel, demo to studs
Ava Castellano · 73 Thistle Ln · From: Simone
  1. Measure & Layout
  2. Order
  3. Prep & Waterproof
  • Demo and backer board$2,400
  • Pan, waterproofing, flood test$3,150
  • Tile walls, floor and niche$7,800
Signed online
Proposal total$13,350
TS-102Step by step

Showers and floors, step by step

A shower fails in the parts nobody sees once the tile is up: the pre-slope, the pan, the corners. Opsite puts the layout sign-off, the waterproofing and the flood test on the job as steps, with photos, before the first tile is set.

  1. Measure & Layout
  2. Order
  3. Prep & Waterproof
  4. Set
  5. Grout & Seal
  6. Walkthrough
  • ✓ Measure & Layout: pattern, grout color and joint width approved by the client
  • ✓ Order: tile ordered with overage, lot numbers and shade checked at delivery
  • ✓ Prep & Waterproof: demo, backer board, pan, hot mop or membrane, flood test
  • ✓ Set: layout lines snapped, field tile, niches and trim, with photos
  • ✓ Grout & Seal: corners caulked, stone and grout sealed, haze cleaned
  • ✓ Inspections tracked: Layout Sign-Off, Substrate Check, Backer Board / Lath, Waterproofing, Shower Pan Flood Test
  • ✓ Walkthrough: punch list, care instructions and leftover tile handed to the client
TS-103Tile & Stone

What changes for tile and stone contractors

Six things owners tell us they wanted and could not get from paper, texts and three different apps.

The flood test has photos

Pan filled to the top of the curb, the water level marked, a photo at fill and another 24 hours later. If the ceiling below ever stains, you can show the pan held.

Layout approved before thinset

The Layout Sign-Off check covers centerlines, pattern, grout color, joint width and where the niche goes. A change after setting starts is a change order the client signs.

Same lot, checked from open boxes

Lot numbers and shade are checked when the tile arrives, with photos filed under Tile Lot & Shade. You find the odd box before it is on the wall.

Rot behind the old tile gets a price

Wet studs, a floor out of level, a wall out of plumb. It goes on a change order the client signs before tile goes over it.

Paid when the pan holds

Special-order tile cannot go back. The payment schedule can ask for a payment when the tile is delivered, when the flood test passes and when the tile is set.

The second niche has a line

Niches, benches and curbs are their own line on the proposal. When the client adds one on set day, it has a price.

TS-104Before and after

Your day today, and your day on Opsite

The same seven moments of a normal week, side by side.

WhatHow most small shops run itWith Opsite
LayoutAgreed by pointing at the wallLayout Sign-Off check, approved before tile is set
Flood testDone, but nobody can prove itPhotos at fill and after 24 hours, on the job
Tile deliveryBoxes opened on set dayLot numbers and shade checked against the order
Rot behind old tileFix it and hope they payChange order signed before tile goes over it
A second nicheThrown in to keep the peaceIts own proposal line, or a signed change order
Progress paymentsA deposit, then wait for the endTied to delivery, flood test, tile set and walkthrough
Leak claim two years laterYour memory against theirsWaterproofing and flood test photos still on the job
TS-105

Questions tile and stone contractors ask us

Is Opsite only for big tile companies?

No. It is built for small shops: a lead setter who owns the company, a helper or two, maybe a second crew. It works whether the homeowner or a general contractor is your client.

Is it only for showers?

No. Job types include Shower Remodel, Tub Surround, Bathroom Floor, Kitchen Backsplash, Floor Tile, Fireplace Surround, Patio & Outdoor Tile and Slab Countertop, plus Regrout & Recaulk and Tile Repair. The flood test check is there for the jobs with a pan.

How is the flood test recorded?

As a check on the job called Shower Pan Flood Test. Its checklist covers the pre-slope, the drain plugged below the weep holes, the pan filled to the top of the curb and held 24 hours, and photos at fill and after with the mark showing.

What if the client changes the layout after we start setting?

The standard terms on the proposal say a change after setting starts is a change order. You write it with the price, and the client signs it before you pull anything off the wall.

Does it figure square footage and overage for me?

No. You measure and figure overage the way you do now. Opsite keeps the order on the job, with a checklist before Order that asks if overage and trim pieces were counted.

How much does it cost?

Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.

TS-106We contact you

See it on one of your own jobs

Bring a real job from last month. We will set up its steps and send its proposal in front of you.

  1. Leave your details. It takes a minute.
  2. We look at your company and contact you. A person calls or texts you.
  3. We show Opsite on your own jobs. Then you decide.

We open access one company at a time. You do not need a card or a contract to ask.

TS-107

What is Opsite for tile and stone contractors?

Opsite is software for contractors and trade companies. For tile and stone contractors it runs each job through its own steps, with a checklist for every inspection, daily photos, change orders the client signs and a punch list. Proposals with a payment schedule, invoices, online payment, purchase orders, a time clock and a client portal are part of the same account.

Not your trade?

Opsite has a page for each trade, with its own steps and checks.

End of sheet set · TS-101 to TS-107