Features Trades AI Software Guide AI Agents Done for you Pricing Blog About FAQ Sign in Get access
CN-101

Concrete software that gets every job ready for pour day.

Driveways, patios, stamped work, slabs and footings, with the 811 ticket and the pre-pour inspection on the job. Built for small concrete contractors with a crew or two.

ProposalSample
Driveway replacement, broom finish
Glen Okafor · 219 Bramble Ct · From: Rosa
  1. Estimate
  2. Permit & Layout
  3. Excavate & Form
  • Demo and haul-off$3,200
  • Base, forms and rebar$4,650
  • Concrete, pump and finish$8,900
Signed online
Proposal total$16,750
CN-102Step by step

Every pour, step by step

Once the truck is backing in, it is too late to find out the inspection was not signed or the pump was never confirmed. Opsite puts everything before the pour on the job as steps and checklists, so pour day is only about the concrete.

  1. Estimate
  2. Permit & Layout
  3. Excavate & Form
  4. Rebar & Pre-Pour
  5. Pour & Finish
  6. Cure & Strip
  7. Closeout
  • ✓ Estimate: truck and pump access, finish and color picked, proposal signed online
  • ✓ Permit & Layout: permit if needed, 811 ticket, layout and heights approved by the client
  • ✓ Excavate & Form: old concrete hauled, base rock compacted, forms set and braced
  • ✓ Rebar & Pre-Pour: rebar on dobies, sleeves in, inspection called, concrete and pump ordered
  • ✓ Inspections tracked: Subgrade & Base, Forms & Rebar (Pre-Pour), Footing / Foundation, Sidewalk & Approach (City), Final
  • ✓ Pour & Finish and Cure & Strip: delivery ticket photos, joints cut, slab barricaded, forms stripped
  • ✓ Closeout: final inspection, walk with the client, cure and care sheet handed over
CN-103Concrete

What changes for concrete contractors

Six things owners tell us they wanted and could not get from paper, texts and three different apps.

The day before the pour is a checklist

Pre-pour inspection signed off, mix, yards and pump confirmed with the plant, weather checked, washout area set up. You see what is still open the day before, not with a truck idling.

Proof of what is under the slab

Photos of the base, the forms, the rebar on dobies and the sleeves are filed by category before they are buried. The delivery ticket photo goes with them.

The arguments are settled before the pour

The terms the client signs say hairline cracks and color variation are normal, and that marks from driving on the slab too early are not covered.

Paid at forms, pre-pour and pour

Progress payments are tied to the steps, so you are not fronting the ready-mix and the pump out of your own pocket.

Soft soil and thick concrete get a price

Roots, wet soil, old concrete twice as thick as expected. It goes on a change order the client signs before the work goes on.

The 811 marks are photographed

The ticket and photos of the marks are saved before demo. The checklist also asks if the client pointed out sprinklers, drains, lighting and gas.

CN-104Before and after

Your day today, and your day on Opsite

The same seven moments of a normal week, side by side.

WhatHow most small shops run itWith Opsite
Pre-pour inspectionHoping the inspector beats the truckSigned off on the checklist before Pour & Finish
Ordering mix and pumpA call from the truck the night beforeMix, yards and pump on the checklist before the pour
What is under the slabNobody took a picturePhotos of base, forms and rebar filed by category
Cracks and colorAn argument a month laterIn the terms the client signed with the proposal
Thick old concrete or soft soilAbsorb it or fight about itA change order signed before the work goes on
Progress paymentsHalf down, the rest when they feel like itTied to forms, pre-pour inspection, pour and strip
The 811 ticketCalled in, ticket number lostTicket and photos of the marks saved before demo
CN-105

Questions concrete contractors ask us

Is Opsite only for big concrete companies?

No. It is built for small contractors: an owner who bids and often finishes, a foreman and a crew or two. You do not need a project manager to run it.

We mostly pour driveways and patios with no permit. Is this too much?

No. A patio still needs an 811 ticket, forms, a pour and a cure, and the client still argues about cracks. The permit and city inspection checks are there for the jobs that need them.

Does it handle stamped and colored work?

Yes. Stamped or Colored Concrete is a job type with its own proposal lines. The client approves the finish and color before you form, and the terms say stamped and colored concrete will not match a sample exactly.

Does Opsite order the concrete or book the inspection?

No. You call the plant, the pump and the city. Opsite keeps the pour on the schedule and puts those confirmations on the checklist before Pour & Finish, so you can see what is still open.

Can I use it for foundations and ADU slabs?

Yes. Foundation / ADU Slab is a job type, and Footing / Foundation is a check with its own checklist: trench depth, rebar per the structural plan, anchor bolts and hold-downs, vapor barrier and the Ufer ground.

How much does it cost?

Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.

CN-106We contact you

See it on one of your own jobs

Bring a real job from last month. We will set up its steps and send its proposal in front of you.

  1. Leave your details. It takes a minute.
  2. We look at your company and contact you. A person calls or texts you.
  3. We show Opsite on your own jobs. Then you decide.

We open access one company at a time. You do not need a card or a contract to ask.

CN-107

What is Opsite for concrete contractors?

Opsite is software for contractors and trade companies. For concrete contractors it runs each job through its own steps, with a checklist for every inspection, daily photos, change orders the client signs and a punch list. Proposals with a payment schedule, invoices, online payment, purchase orders, a time clock and a client portal are part of the same account.

Not your trade?

Opsite has a page for each trade, with its own steps and checks.

End of sheet set · CN-101 to CN-107