Features Trades AI Software Guide AI Agents Done for you Pricing Blog About FAQ Sign in Get access
FD-101

Fence and deck software from the string line to the last gate.

Privacy fences, gates, deck rebuilds and railings in one place. Built for small fence and deck crews that send a lot of bids and build fast.

ProposalSample
120 ft redwood privacy fence
Tessa Okafor · 58 Marigold Ct · From: Ruben
  1. Site & Layout
  2. Permit & 811
  3. Posts & Footings
  • Remove and haul old fence$1,150
  • 120 ft redwood fence, 6 ft high$8,640
  • 4 ft side gate with hardware$890
Signed online
Proposal total$10,680
FD-102Step by step

Fences and decks, step by step

A fence sits on a line the neighbor will look at for twenty years, and a deck has footings and framing the inspector must see before they are covered. Opsite gives each job its own steps, so the line is approved before a hole is dug and nothing is covered before it is signed.

  1. Site & Layout
  2. Permit & 811
  3. Posts & Footings
  4. Framing & Rails
  5. Boards & Finish
  6. Walkthrough
  • ✓ Site & Layout: the string line, gate locations and which side the posts face, shown to the client
  • ✓ Permit & 811: the deck permit, HOA approval, neighbor notice and the 811 ticket tracked on the job
  • ✓ Posts & Footings: utility marks photographed before digging, rock or old concrete priced as a change order
  • ✓ Framing & Rails: wall behind the ledger checked for rot, hangers and hardware photographed before decking
  • ✓ Boards & Finish: fence boards or decking, railings, gates and hardware, stain or seal
  • ✓ Inspections tracked: 811 Utility Locate, Property Line Sign-Off, Footing, Deck Framing, Pool Barrier, Final (Deck)
  • ✓ Walkthrough: gates latching, railings solid, old material hauled, last payment collected
FD-103Fencing & Decks

What changes for fence and deck builders

Six things owners tell us they wanted and could not get from paper, texts and three different apps.

The line is approved before a hole is dug

The proposal the client signs says the fence goes on the line the client approves at layout. The Property Line Sign-Off check and a photo of the string line show what that was.

811 marks on record

The 811 Utility Locate checklist covers the ticket, the marks and the sprinkler and gas lines the client pointed out. Photos of the marks are saved before the auger comes out.

No footing poured before it is signed

On a deck, Footing, Deck Framing and Final (Deck) each have a checklist. Holes stay open and hangers stay in view until the inspector has been.

Bids that get an answer

Fence buyers collect three bids and go quiet. Opsite sends follow-up messages on proposals that have not been answered, so the job does not go to whoever called back.

Rot behind the ledger gets signed

Rock in a post hole or rot in the house wall gets a photo, a price and a change order the client signs before the work goes on.

Lumber covered before the posts go in

Tie payments to the steps: materials delivered, posts and framing, boards and railings, walkthrough. A one-day repair can be one invoice at completion.

FD-104Before and after

Your day today, and your day on Opsite

The same seven moments of a normal week, side by side.

WhatHow most small shops run itWith Opsite
Property lineThe client points, you build, the neighbor complainsString line approved by the client, photo on the job
Calling 811Ticket number in a text somewhere811 Utility Locate checklist and photos of the marks
Deck ledgerBolted on over rot nobody opened upChecklist before Framing & Rails: wall behind the ledger checked
Deck footingsConcrete ordered, inspector not bookedFooting inspection tracked before Framing & Rails starts
Rock or rot foundEat the cost or argue at the endA change order the client signs before work goes on
Pool fencesLatch height and gaps from memoryPool Barrier checklist: height, gaps, gate swing, latch
The last checkAsked for at the walkthrough, mailed wheneverPaid online by card or bank from the invoice
FD-105

Questions fence and deck builders ask us

Is Opsite only for big fence and deck companies?

No. It is built for small outfits: an owner who bids and one or two crews in the field. A fence repair and a permitted deck both fit.

We build fences and decks. Do they use the same steps?

Yes. Both run on the same six steps, from Site & Layout to Walkthrough. The footing, framing and final inspections matter on a deck. A fence-only job has no city inspections to track.

Does Opsite call 811 or pull the deck permit for me?

No. You call in the ticket and pull the permit. Opsite tracks both on the job, with a checklist for the locate and a place for photos of the marks before you dig.

How does it help with property line arguments?

Two ways. The standard terms on your proposal put the line and any neighbor agreement on the client. Then the Property Line Sign-Off check and the string line photo show what the client approved on layout day.

Is it worth using on a one-day fence repair?

Yes, if you want the bid signed and the money collected the same way every time. A repair can be a short proposal, a few before and after photos, and one invoice the client pays online.

How much does it cost?

Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.

FD-106We contact you

See it on one of your own jobs

Bring a real job from last month. We will set up its steps and send its proposal in front of you.

  1. Leave your details. It takes a minute.
  2. We look at your company and contact you. A person calls or texts you.
  3. We show Opsite on your own jobs. Then you decide.

We open access one company at a time. You do not need a card or a contract to ask.

FD-107

What is Opsite for fence and deck builders?

Opsite is software for contractors and trade companies. For fence and deck builders it runs each job through its own steps, with a checklist for every inspection, daily photos, change orders the client signs and a punch list. Proposals with a payment schedule, invoices, online payment, purchase orders, a time clock and a client portal are part of the same account.

Not your trade?

Opsite has a page for each trade, with its own steps and checks.

End of sheet set · FD-101 to FD-107