Solar software that tracks the job from site survey to PTO.
Rooftop solar, batteries, panel resets and main panel upgrades, with the city and utility steps on the job. Built for small solar contractors, not national sales outfits.
- Site Survey
- Design & Permit
- Utility Application
- 8 kW array, 20 panels$23,600
- Home battery, backup panel$14,900
- Permit and interconnection$1,850
From site survey to Permission to Operate, step by step
A solar install takes a couple of days, but the permit, the utility application, the city final and the PTO letter take weeks. Opsite gives each one its own step, so you can see where every job is sitting.
- Site Survey
- Design & Permit
- Utility Application
- Install
- Inspection
- Permission to Operate
- Closeout
- ✓ Site Survey: photos of the roof, attic and rafters, main panel and meter
- ✓ Design & Permit: client sign-off on the panel layout, structural letter, city permit
- ✓ Utility Application: interconnection submitted, client signatures, utility corrections answered
- ✓ Install: mounts and flashing, panels, inverter, battery, labels and placard, with photos
- ✓ Inspections tracked: Structural / Roof, Electrical Final, Battery Storage, Utility Meter Set, System Commissioning
- ✓ Permission to Operate: signed permit sent to the utility, meter change, PTO letter on the job
- ✓ Closeout: monitoring set up, warranties registered, serial number photos, final payment
What changes for solar contractors
Six things owners tell us they wanted and could not get from paper, texts and three different apps.
You know which jobs are waiting on PTO
Install done, city passed, utility quiet. Each job shows the step it is on, so a job stuck at Permission to Operate is something you can see and chase.
The last payments are tied to the last steps
Bill at equipment delivered, install complete, city inspection passed and Permission to Operate. The final payment is not forgotten when the PTO letter shows up two months later.
Ready before the inspector climbs the ladder
A checklist before Inspection: labels and placard on, photos of flashing, attic and wiring saved, roof swept. A failed city final costs you a week.
Roof and panel surprises get signed first
A tired roof or a main panel that needs an upgrade goes on a change order the client signs before that work is done.
Fewer calls asking when it turns on
The client portal shows the step the job is on, with photos and documents. Waiting on the utility is something the client can see for themselves.
Photos for the roof leak and the warranty claim
Photos are filed under Mounts & Flashing, Serial Numbers, Labels & Placard and Inspection Card. Years later the picture of that flashing is still on the job.
Your day today, and your day on Opsite
The same seven moments of a normal week, side by side.
| What | How most small shops run it | With Opsite |
|---|---|---|
| Where a job stands | A spreadsheet with a status column | Seven steps, from Site Survey to Closeout |
| Utility application | An email thread per customer | Its own step: submitted, signatures, corrections |
| Panel layout sign-off | A yes over text | On the checklist before Install starts |
| City final | A label is missing and the inspector leaves | A checklist before Inspection, with the photos saved |
| Turning the system on | The customer flips the breaker early | Utility Meter Set check: on only after the PTO date |
| Final payment | Forgotten by the time PTO arrives | Tied to the Permission to Operate step |
| Customer asking for updates | Calls to whoever sold the job | The client portal shows the step and the photos |
Questions solar contractors ask us
Is Opsite only for big solar companies?
No. It is built for small contractors: an owner, someone who handles permits and the utility, and an install crew or two. It does not assume a sales floor or a design department.
Does Opsite design the system or draw the panel layout?
No. Design stays in the tool you use today. Opsite tracks that the client signed the layout, the structural letter is in and the permit was submitted.
Does it file the interconnection application with the utility?
No. You file with the utility the way you do now. Opsite gives the application its own step with its tasks, and keeps the PTO letter on the job.
Can it handle a panel removal and reset for a re-roof?
Yes. Panel Removal & Reset (Re-Roof) is a job type with its own proposal line. The standard terms say the system is tested before the panels come off and again after they go back.
How do I get paid when the utility takes months?
The payment schedule on the proposal ties payments to steps: deposit, equipment delivered, install complete, city inspection passed, then Permission to Operate. Only the last payment waits on the utility.
How much does it cost?
Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.
See it on one of your own jobs
Bring a real job from last month. We will set up its steps and send its proposal in front of you.
- Leave your details. It takes a minute.
- We look at your company and contact you. A person calls or texts you.
- We show Opsite on your own jobs. Then you decide.
We open access one company at a time. You do not need a card or a contract to ask.
What is Opsite for solar contractors?
Opsite is software for contractors and trade companies. For solar contractors it runs each job through its own steps, with a checklist for every inspection, daily photos, change orders the client signs and a punch list. Proposals with a payment schedule, invoices, online payment, purchase orders, a time clock and a client portal are part of the same account.
Not your trade?
Opsite has a page for each trade, with its own steps and checks.