Flooring software that runs the job from measure to walkthrough.
LVP, hardwood, carpet, laminate and refinishing, with acclimation and moisture readings on the job. Built for small flooring shops with a few install crews.
- Measure & Quote
- Order & Acclimate
- Demo & Prep
- Carpet tear-out and haul$1,100
- LVP and underlayment, 1,100 sq ft$5,280
- Install, base and transitions$4,510
Installs and refinishes, step by step
Most flooring callbacks start before the first board goes down: wood that never acclimated, a slab that read wet, a subfloor nobody flattened. Opsite puts those checks on the job as steps, so they are done and on record before the install starts.
- Measure & Quote
- Order & Acclimate
- Demo & Prep
- Install
- Trim & Transitions
- Walkthrough
- ✓ Measure & Quote: rooms, stairs, subfloor type and the product the client picked
- ✓ Order & Acclimate: delivery checked for count and lot numbers, moisture readings logged
- ✓ Demo & Prep: old flooring out, moisture test, subfloor ground and leveled
- ✓ Install: starting wall, board direction and transitions confirmed with the client first
- ✓ Trim & Transitions: baseboard, shoe, reducers, stair nosing and door trimming
- ✓ Checks tracked: Asbestos Test (Old Flooring), Acclimation Check, Moisture Test, Subfloor Flatness, Final Walkthrough
- ✓ Walkthrough: punch list fixed, care sheet and leftover boxes handed over, final payment
What changes for flooring contractors
Six things owners tell us they wanted and could not get from paper, texts and three different apps.
Moisture readings with a date on them
Slab and subfloor readings, the date and a photo of the meter are saved on the job. When a floor cups a year later, you can show what it read before you installed.
The subfloor surprise gets signed
Nobody sees the subfloor until the old floor is up. Rot or extra leveling goes on a change order the client signs before the crew keeps going.
Paid when the flooring lands
Material is about half the job. The payment schedule can put a payment at Flooring Delivered, so you are not carrying the material until the last transition is in.
Right count, right lot
The Acclimation Check has the crew count the boxes and match run or dye lot numbers at delivery. Photos are filed under Delivery & Lot Numbers.
Old vinyl is tested before tear-out
The Asbestos Test check keeps the lab report on the job. Its checklist says no sanding, grinding or scraping of the old floor until the result is back.
Furniture and toilets are on the proposal
Furniture moving, toilet and appliance pull and reset, and door trimming are their own lines. They are priced or plainly left out before install morning.
Your day today, and your day on Opsite
The same seven moments of a normal week, side by side.
| What | How most small shops run it | With Opsite |
|---|---|---|
| Acclimation | Boxes in the garage, fingers crossed | Acclimation Check with readings at delivery and before install |
| Moisture readings | Written on a box flap | Saved on the job with the date and meter photo |
| Bad subfloor under the carpet | A call from the driveway and a handshake price | A change order the client signs before work continues |
| Old sheet vinyl or black mastic | Scrape it and hope | Asbestos Test check, lab report saved before tear-out |
| Furniture, toilets and doors | Argued about on install morning | Their own lines on the signed proposal |
| Paying for material | You carry the flooring until the job ends | A payment due when the flooring is delivered |
| A complaint a year later | No record of what you found | Readings, photos and the walkthrough checklist on the job |
Questions flooring contractors ask us
Is Opsite only for big flooring companies?
No. It is built for small shops: an owner who still does the measures, someone in the office and a few install crews. It is not made for a chain of showrooms.
Does it cover carpet and refinishing, or only hard surface installs?
All of them. Job types include LVP, engineered and solid hardwood, carpet, laminate, sheet vinyl, stairs and hardwood refinishing, plus board replacement and carpet restretch. The proposal has lines for stairs and for sand, stain and finish.
Where do the moisture readings go?
On the job. The Moisture Test checklist asks for the readings, the date and a photo of the meter, and the photos are filed under Moisture Readings.
What happens when we pull the carpet and the subfloor is bad?
You write a change order with the photos and the price, and the client signs it before work continues. The standard terms on the proposal already say rotted subfloor and extra leveling are not included unless they are listed.
Most of my installers are subs. Can I track them?
Yes. Each subcontractor is on the job, and their insurance certificates are tracked in Opsite instead of in an email folder.
How much does it cost?
Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.
See it on one of your own jobs
Bring a real job from last month. We will set up its steps and send its proposal in front of you.
- Leave your details. It takes a minute.
- We look at your company and contact you. A person calls or texts you.
- We show Opsite on your own jobs. Then you decide.
We open access one company at a time. You do not need a card or a contract to ask.
What is Opsite for flooring contractors?
Opsite is software for contractors and trade companies. For flooring contractors it runs each job through its own steps, with a checklist for every inspection, daily photos, change orders the client signs and a punch list. Proposals with a payment schedule, invoices, online payment, purchase orders, a time clock and a client portal are part of the same account.
Not your trade?
Opsite has a page for each trade, with its own steps and checks.