Features Trades AI Software Guide AI Agents Done for you Pricing Blog About FAQ Sign in Get access
PT-101

Painting software that runs the job from color sign-off to walkthrough.

Interior and exterior repaints, cabinets, trim and stain work in one place. Built for small painting contractors with a crew or two.

ProposalSample
Exterior repaint, two-story stucco
Gordon Vance · 1406 Alder Creek Dr · From: Rosa
  1. Estimate & Colors
  2. Prep
  3. Prime
  • Wash, scrape, patch and caulk$3,400
  • Prime and two finish coats$8,900
  • Trim, fascia and doors$2,650
Signed online
Proposal total$14,950
PT-102Step by step

Paint jobs, step by step

Most paint problems start before a can is opened: the wrong color, thin prep, an old house with no lead-safe setup. Opsite gives the job six steps, so each of those is settled before the finish coats go on.

  1. Estimate & Colors
  2. Prep
  3. Prime
  4. Paint
  5. Touch-Up & Walkthrough
  6. Closeout
  • ✓ Estimate & Colors: brush-out samples, then color name, number and sheen for each room, signed before paint is ordered
  • ✓ Prep: wash, mask, scrape, patch and caulk, with lead-safe setup on homes built before 1978
  • ✓ Prime: spot prime, stain block or a full prime coat, with photos before the finish coats cover it
  • ✓ Paint: a checklist first: Prep Check passed, primer dry, colors on site checked against the color sheet
  • ✓ Checks tracked: Color Sign-Off, Lead-Safe Check (Pre-1978), Prep Check, Lead-Safe Cleanup Verification, Final Walkthrough
  • ✓ Touch-Up & Walkthrough: the blue tape list becomes a punch list, closed item by item
  • ✓ Closeout: leftover paint labeled, color record to the client, after photos, final invoice
PT-103Painting

What changes for painting contractors

Six things owners tell us they wanted and could not get from paper, texts and three different apps.

Colors signed before you buy paint

Color Sign-Off records the color name, number and sheen for each room, approved on a brush-out sample, plus the HOA approval when there is one. A change after that is a change order.

Lead-safe records on file

On homes built before 1978, the setup check and the cleanup verification each have a checklist: pamphlet receipt, containment, cleaning verification. The record stays on the job.

Dry rot does not come out of your pocket

Rot shows up when you scrape. Take a photo, price it and get a signed change order before the carpenter starts.

The blue tape list has an end

Walk the job once with the client, put every item on the punch list and close them one by one. The last payment is tied to the walkthrough.

You know what color is in the hallway

Paint Can Labels is a photo category, and the color sheet stays on the job. When the client calls for a touch-up in three years, nobody is guessing.

Estimates that get an answer

Painting is a lot of estimates. Lino writes the scope, the client signs online, and follow-up messages go out on the ones that go quiet.

PT-104Before and after

Your day today, and your day on Opsite

The same seven moments of a normal week, side by side.

WhatHow most small shops run itWith Opsite
Picking colorsA text that says the gray oneColor name, number and sheen, signed before paint is ordered
A house built before 1978The pamphlet is in the truck, maybeLead-safe checklists at setup and at cleanup, kept on the job
Dry rot under the paintFix it and hope they payA change order with photos, signed first
Before the finish coatsThe crew lead eyeballs itA Prep Check: scraped, sanded, patched, caulked, masked
The walkthroughBlue tape that keeps multiplyingOne punch list, closed item by item
The last paymentHeld until the client feels like itTied to Touch-Up & Walkthrough and paid online
A touch-up call three years laterGuess the color from a faded wallThe color sheet and can label photos are on the job
PT-105

Questions painting contractors ask us

Is Opsite only for big painting companies?

No. It is built for small painting contractors: an owner who does the estimates, one or two crews and someone on the books. A painter with one helper can use it too.

What if the client changes a color after we bought the paint?

The signed color sheet shows what was approved. The new color is a change order with a price, and the client signs it before you repaint.

Does it help with lead-safe rules on older homes?

Yes. For homes built before 1978 there are two checks: Lead-Safe Check (Pre-1978) at setup and Lead-Safe Cleanup Verification at the end. Each has a checklist, and photos go under Lead Test and Containment. It keeps the record. It does not replace your certification.

Can I get paid in stages instead of at the end?

Yes. The proposal carries a payment schedule: deposit, prep complete, finish coats complete, then touch-up and walkthrough. The client pays each one online by card or bank, and invoices sync to QuickBooks.

We also do cabinets and deck staining. Is that covered?

Yes. Cabinet Refinishing and Deck & Fence Staining are job types with their own proposal lines. The Prep Check even covers numbering cabinet doors and bagging the hardware.

How much does it cost?

Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.

PT-106We contact you

See it on one of your own jobs

Bring a real job from last month. We will set up its steps and send its proposal in front of you.

  1. Leave your details. It takes a minute.
  2. We look at your company and contact you. A person calls or texts you.
  3. We show Opsite on your own jobs. Then you decide.

We open access one company at a time. You do not need a card or a contract to ask.

PT-107

What is Opsite for painting contractors?

Opsite is software for contractors and trade companies. For painting contractors it runs each job through its own steps, with a checklist for every inspection, daily photos, change orders the client signs and a punch list. Proposals with a payment schedule, invoices, online payment, purchase orders, a time clock and a client portal are part of the same account.

Not your trade?

Opsite has a page for each trade, with its own steps and checks.

End of sheet set · PT-101 to PT-107