Fire sprinkler software from submittal to hydro test to final.
Tenant improvements, new systems, required inspections and leaking-head calls in one place. Built for small fire protection shops, not for a national service company.
- Booked
- On site
- Done & paid
- Replace head, drain and refill$485
- + Replace 10 painted heads$650
- All deficiencies on the report$1,890
From the phone call to the payment, in four steps
Every call has three states your whole team can see: Booked, On site, Done and paid. Nothing sits in a text thread.
Book
Take the call, pick the address, the tech and the time. The leaking-head call lands on the right fitter's day.
On the way
One tap texts the customer that the tech is on the way. No more "where are you?" calls to the office.
On site
The tech picks the price from your price book, adds options, takes photos and writes what was found and done. A leaking head can go out as three choices: replace the head, replace it along with the painted heads nearby, or clear the whole deficiency list. The customer signs on the phone.
Done & paid
Card or bank on the spot, or a pay link by text. The customer gets a service report, and a few minutes later a request for a review.
The owner sees the whole day by tech. Each tech sees only their own day. Text messages need a one-time number registration, which we set up with you.
Tenant improvements and new systems, step by step
A sprinkler job is won or lost before any pipe goes up: plan check, the permit and the shutdown. Opsite gives it its own six steps, so the hydro test is not booked before the cure time is met and the final does not wait on a missing sign.
- Design & Submittal
- Permit
- Rough-In
- Hydro Test
- Trim
- Final & Certification
- ✓ Design & Submittal: field survey, water flow data, calculations and shop drawings as sub-tasks
- ✓ Permit: plan check corrections, stamped plans and the permit tracked, pipe ordered on a purchase order
- ✓ Rough-In: a checklist before the step starts, from the shutdown to open ceilings
- ✓ Hydro Test: start and end gauge photos filed under Hydro Gauge
- ✓ Inspections tracked: Underground Flush & Hydro, Overhead Rough, Hydrostatic Test, Final, 5-Year Test & Certification
- ✓ Trim: heads, cover plates, signs, gauges and the spare head cabinet on the punch list
- ✓ Final & Certification: main drain and alarm tests on the checklist, test certificate kept with the job at closeout
What changes for fire protection contractors
Six things owners tell us they wanted and could not get from paper, texts and three different apps.
No crew sent to a closed ceiling
The checklist before Rough-In asks what costs you a day: plans stamped, permit on site, shutdown scheduled with the client and the alarm company, ceilings open.
Hydro test proof with the time on it
Start and end gauge photos are filed under Hydro Gauge on the job. When someone asks a year later, the two-hour test is there.
Deficiencies turn into repair work
Write the deficiencies up as a proposal the client signs online. If they do not answer, follow-up messages go out, so the quote does not die in an inbox.
The next inspection gets offered on time
Set a yearly reminder for the sprinkler inspection, the backflow test or the fire pump test. The office offers it before the tag is out of date.
Paid for design before the pipe is up
Progress payments are tied to the job's steps. A payment can come due when the plans are approved and the permit is issued, not after rough-in.
Plan check changes get signed
Heads the plan checker adds after submittal become a change order the client signs. The shop stops absorbing them.
Your day today, and your day on Opsite
The same seven moments of a normal week, side by side.
| What | How most small shops run it | With Opsite |
|---|---|---|
| Leaking head call | Whoever answers sends whoever is free | Booked on a fitter's day with the building's notes |
| Plan check corrections | Extra heads eaten by the shop | A change order the client signs |
| Before rough-in | Crew arrives, ceilings still closed | A checklist first: permit, shutdown, ceilings open |
| Hydro test | A gauge photo on someone's phone | Start and end gauge photos filed on the job |
| Deficiency quotes | Sent once, never chased | Follow-up messages on quotes with no answer |
| Design payment | Billed after the pipe is up | A progress payment when the permit is issued |
| Next required inspection | A spreadsheet of due dates | A reminder to offer the inspection again |
Questions fire protection contractors ask us
Is Opsite only for big fire protection companies?
No. It is built for small sprinkler shops: an owner, a designer or office person and a couple of fitter crews. You can start with inspections and repairs and add installs later.
Does Opsite file inspection reports with the fire department?
No. You still fill out and submit the required forms yourself. Opsite keeps the visit, the photos, the deficiencies you found, the repair quote and the reminder for next time.
Can it handle a tenant improvement with plan check and a hydro test?
Yes. The job follows six steps: Design & Submittal, Permit, Rough-In, Hydro Test, Trim, Final & Certification. Each inspection has its own checklist, and the permit is tracked on the job.
How do deficiency repairs get approved?
Write the repairs as a proposal with line items in your own categories, such as Repairs & Deficiencies. The client signs online, and unanswered proposals get follow-up messages.
Can I bill design before any pipe is hung?
Yes. The payment schedule on the proposal ties progress payments to the job's steps, so one can come due when the plans are approved and the permit is issued.
How much does it cost?
Book a demo. We will show it on one of your own jobs and go over the plan that fits your company.
See it on one of your own calls
Bring a real call from last week. We will book it, price it and close it in front of you.
- Leave your details. It takes a minute.
- We look at your company and contact you. A person calls or texts you.
- We show Opsite on your own calls. Then you decide.
We open access one company at a time. You do not need a card or a contract to ask.
What is Opsite for fire protection contractors?
Opsite is software for contractors and service companies. For fire protection contractors it runs service calls from booked to paid, with a price book, options the customer signs on the phone, payment on the spot, a service report and a review request. Bigger jobs run as projects with their own steps, permits and inspections. Proposals, invoices, purchase orders, a time clock and a client portal are part of the same account.